Meanings of level in the construction industry
In relation to the built environment, the term ‘level’ can have several different meanings.
- It can be used as another term for a building’s storey or floor, i.e. ‘level 3’, or 'finished floor level'.
- It can be a term to refer to degrees of implementation of building information modelling, i.e. ‘BIM level 2’, or the information itself, i.e. ‘level of detail’.
- In surveying, levelling is a process of determining the height of one point (or level) relative to another. It is used in surveying to establish the elevation of a point relative to a datum, or to establish a point at a given elevation relative to a datum. There are several different surveying instruments that can be used, all of which are loosely referred to as ‘levels’, for example, a spirit level. A line level is a level that hangs on a builder’s string line. See also: Spirit level and Plumb level.
- The term is also used in relation to ground preparation and excavation, i.e. ‘level an area’. This means that the ground is made flat and of an even grade. This is important if works are to be carried out on uneven or sloping ground. In this context, the terms ‘level’ and ‘flat’ can be interchangeable, however, in other contexts they should be distinguished from one another. For example, when laying floor tiles; a level surface needs to be parallel to its perfectly horizontal plane, whereas a flat surface is one that does not have significant high or low spots.
- In terms of project management, it be used in the context of ‘resource levelling’ which is a technique whereby the demand for limited resources is accommodated by adjusting the project programme. In construction, this can be used to analyse the large variations in resource usage that can occur over time, and which can be inefficient and costly. For more information, see Resource levelling.
It can also be used to refer to an amount of something, such as; water level, sound level, light level, and so on.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.